One on one exclusive financial and tax consultation
Free Practical Information for Going Overseas to Thailand
Analyze the challenges and opportunities of the industry in Thailand
Service Positioning: Scope and Boundaries
Z&X provides Chinese new energy companies with entry route assessment, company setup and handling of agreed approval matters. Coverage includes manufacturing projects for battery cells, modules and battery packs, energy storage systems and components, and solar and charging equipment, as well as entity and market access arrangements for equipment sales, engineering and O&M, and energy project investment.
The starting point is to establish exactly what the company will produce in Thailand, what it will sell and whom it will charge. Cell manufacturing, battery pack assembly and installing purchased complete units require different evidence and access conditions; manufacturing charging equipment and operating charging stations must also be assessed separately. On this basis, Z&X defines the business scope, the combination of entities and the dependencies between approvals.
| Assessment item | Focus of general manufacturing services | Additional assessment for new energy projects |
|---|---|---|
| Products and use | Products, processes and manufacturing category. | Distinguish cells, modules, battery packs, complete energy storage units and structural parts, and verify vehicle, energy storage and industrial uses, rather than applying a category based on the end industry. |
| Business access | Factory setup and sale of own products. | Separately check resale of purchased equipment, installation, engineering, O&M, and power generation and sale; a manufacturing project approval cannot cover all of these businesses. |
| Permit interfaces | Factory and supporting conditions for production. | Check hazardous substances such as electrolyte, and fire and environmental interfaces, according to materials and processes; for operating projects, also check electricity licensing or exemption and grid connection conditions. |
| Key milestones | Equipment and staff in place, and start of production. | Link trial production, customer validation, on-site commissioning and commercial operation separately, and clarify which documents are prerequisites for starting the next stage. |
Scope of Services: What Z&X Handles for Chinese New Energy Companies
| Service item | New energy specific content |
|---|---|
| Market access and company setup | Compare shareholding, capital and entity arrangements separately for manufacturing, trading, engineering, O&M and operation; handle company incorporation, applicable foreign business licenses or certificates and supporting registrations, and assist with bank account opening. |
| BOI eligibility and category | Check the current list of activities and announcements, distinguishing use and in-house, purchased and outsourced processes; verify substantive production, value added and technology conditions by category, and organise the application, responses during review and interviews.〔1〕〔2〕 |
| Technical document review | Check specifications, processes, equipment and materials; calculate capacity in pieces/year, sets/year or MWh/year from equipment cycle times and working hours, and explain how it differs from product energy storage capacity and power plant output. |
| Factory and specialist interfaces | Handle agreed factory permit matters; list applicability checks, responsible specialist parties and prerequisite documents for hazardous substances, environmental, fire and electricity procedures, and coordinate with the engineering team.〔4〕 |
| Imports and staff | Link approval and certificate collection, applicable machinery and raw material filings, and BOI foreign positions, visas and work permits; distinguish production equipment, equipment imported for resale and equipment for engineering use, and check incentives and procedures for each. |
| Contracts and finance and tax | Check actual responsibilities, pricing and collection for supply, installation, commissioning and O&M; assess withholding tax, VAT, permanent establishment and related-party transaction issues, and link project-based accounts with ongoing compliance.〔5〕 |
Electricity licensing or exemption, grid connection and power purchase procedures, engineering design and construction, specialist technical work for environmental impact assessment and fire safety, and certification and acceptance are handled by the company and specialist firms; Z&X is responsible for the agreed entity documents and interface coordination. ODI and foreign exchange registration in China, customs declaration operations and non-BOI work permits are arranged separately.
How Z&X Differs from a Standard Registration and Approval Service
In new energy projects, head office plans investment by product, engineering organises equipment by production line, and the commercial team signs contracts by supply and installation. Z&X maps these documents to the review requirements, identifies differences that would change the entity, incentives or performance conditions, and organises confirmation by all parties.
| Point of comparison | Single-task agency approach | How Z&X handles it |
|---|---|---|
| Project basis | Proceeds under the industry name the company provides. | Assesses each item by product, use and processes in Thailand; for activities whose promotion scope has been adjusted, such as solar, checks the policy first and then estimates incentives. |
| Entity arrangements | Registers the company first and deals with additional business later. | Compares access routes separately for own production, resale and services; assesses the equipment-related service promotion route (TISO), with access for civil works checked separately.〔3〕 |
| Review responses | Translates and forwards documents provided by each department. | The Thai team clarifies the review conditions, the China team organises supplementary evidence from engineering, purchasing and finance, and submission follows only once use, process and investment versions are aligned. |
| Project coordination | Follows up registration, BOI and permits separately. | Puts the approved scope, import items, site permits and commissioning plans on one task list, and flags impacts on production or contract performance promptly. |
If a company plans to file for energy storage system manufacturing but in Thailand only produces the enclosures, with cells and power conversion equipment all purchased, Z&X first verifies whether the filing covers the enclosures, system integration or several manufacturing activities, and then organises the process, purchasing and capacity basis. This decision sets the basis for the equipment list and incentive estimates, and helps keep later sales consistent with the approved scope.
In new energy projects, Z&X's in-house CODE compliance-growth model works as follows: O coordinates business, entities and contracts; D defines confirmation responsibilities for the Chinese and Thai teams and the client's technical staff; C tracks approval, import, production and performance milestones; E keeps the category basis, technical review working papers, query responses and delivery records for later filings and finance and tax services.
Service Value: Which Concerns of Chinese New Energy Companies Z&X Addresses
| Client concern | How Z&X responds and the value |
|---|---|
| Our products are new energy products. Does that mean we qualify for incentives? | Verify against the current promotion scope and actual processes; cells, modules, battery packs and components are assessed separately, rather than letting policies for the whole industry chain stand in for this project's eligibility. |
| The same part is used in both vehicles and energy storage. | Clarify each product and the filing scope from use, customer and order documents, compare applicable routes, and reduce requests for additional documents caused by names not matching real use. |
| We only sell equipment and do installation. What kind of entity do we need? | Check trading and service access, contract responsibilities and staffing item by item, and compare licensing, promotion and other lawful routes; a representative office is not used to carry out fee-earning business. |
| Once BOI is approved, can we start commissioning or selling electricity right away? | Check factory, on-site electricity licensing or exemption, grid connection and other conditions and the progress of specialist procedures, rather than treating investment promotion approval as covering all operating permits.〔4〕 |
| If supply and service contracts are split, is there no tax risk? | Assess permanent establishment and taxes on payments based on actual performance, project duration, staff activities and pricing; neither contract form nor days of presence alone can replace a full assessment.〔5〕 |
Which Chinese New Energy Companies This Service Fits
| Company situation | What Z&X focuses on |
|---|---|
| Manufacturing battery cells, modules, battery packs or energy storage systems in Thailand. | Organise category, process and capacity evidence according to the manufacturing level completed in Thailand, and link specialist conditions for materials and sites. |
| Energy storage structural parts and component plants serving both vehicle and industrial uses. | Define what is filed from real uses and forming processes, and calibrate category and incentive expectations. |
| Manufacturing or assembly of solar, inverter, charging and electrical equipment. | Check each product's current promotion eligibility and process conditions, distinguish own production, purchased parts and assembly, and arrange import and staff procedures. |
| Supplying equipment only, while also handling engineering, commissioning and long-term O&M. | Clarify access, on-site performance and tax responsibilities for each entity before signing, rather than applying a manufacturing company plan directly. |
| Investing in solar power plants, energy storage operation or other energy projects. | Check the business model, project entity and applicable promotion route, and link the entity and finance and tax documents needed for electricity, grid connection and financing. |
What Z&X Delivers to Chinese New Energy Companies
| Deliverable | Verifiable content | Client use |
|---|---|---|
| Business and entity plan | Access assessment for each activity, entity and contract relationships, route comparison and matters for management confirmation. | Decide the entry route and contracting entity. |
| Category and technical file | Category condition comparison, use and process explanations, equipment, materials and capacity working papers, and a gap and supplementary evidence list. | Support investment decisions and review responses. |
| Registration and approval documents | Agreed company and supporting registrations, permit applications, BOI approval and certificate, and factory procedure results. | Link later imports and production. |
| Project coordination task list | Specialist permit interfaces, responsible persons, prerequisite documents and target milestones, and records of applicable import and staff procedures. | Track commissioning, production and performance conditions. |
| Contract and compliance handover documents | Supply and service tax assessment, related-party pricing documentation requirements, project-based accounts and an ongoing compliance handover checklist. | Support later collections, accounting and reviews. |
The company confirms real uses, technical parameters and business arrangements, and arranges funding, premises and specialist engineering conditions; Z&X is responsible for the agreed assessment, checking, submission and follow-up, with confirmation by version and sign-off against checklists. Later BOI ongoing compliance, accounting and tax, transfer pricing and annual audit can be entrusted to Z&X separately.
Z&X New Energy Project Service Team
| Member and position | Responsibilities in new energy projects |
|---|---|
| Lijia Li General Manager of China | Coordinates liaison with head offices in China, and organises confirmation of entity, contract and cross-border finance and tax plans. |
| Qing Su BOI Project Lead | Responsible for eligibility and category assessment, organising application documents, online system filings and communication during review. |
| Biaoshun Jia General Manager of EEC Branch | Draws on a manufacturing finance background to link engineering, purchasing and financial data, and handles local project procedures. |
If you are planning a new energy business in Thailand, please send your business list, products and uses, processes performed in Thailand and outsourced, equipment and main materials, supply and service contract arrangements, preferred site, staff to be assigned and target milestones, and book a new energy project access and approval assessment with Z&X. Sensitive documents can be provided once confidentiality arrangements are in place.
Related Services
Thailand Company Registration & Approval Services
Thailand BOI Investment Promotion Application Services
Related Solutions
Thailand Factory Setup Roadmap: Scheduling Every Work Stream from Registration to Production
Finance and Tax Solution for Chinese Manufacturers in Thailand
Addressing BOI Policy Misunderstandings and Difficulty Realising Incentives
Related Cases
FAQ and Downloads
How to Choose a BOI Project Category in Thailand
Can a Chinese company hold 100% of a Thai company in the manufacturing, trading and service sectors respectively?
Thailand Foreign Business License (FBL): Requirements and Approval Time
Thailand Company Registration Document Checklist (PDF)
BOI Application Form Guide (PDF, Chinese, 4 pages)
Public References
〔1〕BOI List of Promoted Activities and Conditions
〔2〕BOI Announcement Sor. 5/2568: Adjustments to Battery and Certain Solar Activities
〔3〕BOI FAQ on Foreign Business and the Scope of TISO
〔4〕Energy Regulatory Commission of Thailand: Electricity License and Exemption Application Forms
〔5〕Thailand–China Tax Treaty, Article 5: Permanent Establishment